My Publication

# Year Title Report
1 Therriault, R.G. 2022.

Report on 2021 Fuchsite Project Field Program.  Prepared for Ethos Gold Corp. Ontario Assessment Report.

2 Therriault, R.G. 2022

Report on 2021 Heaven Lake Project Field Program. Prepared for Ethos Gold Corp. Ontario Assessment Report.

3 Therriault, R.G. 2021.

.  Report of Prospecting Work Completed on the Fairchild Project, May 5 to May 17.  Prepared for Ethos Gold Corp. Ontario Assessment Report.

4 Therriault, R.G. 2011.

Report on the 2011 diamond drilling program, Red Lobster Property, southwest British Columbia, October 20 to December 23, 2011.

5 Therriault, R.G. 2011.

Boston Property Site Visit, Eastern Mindanao, Philippines.

6 Therriault, R.G. 2011.

Jaurdi Hills Target Selection - September 2011, Coolgardie Gold Fields, Western Australia.

Not Available
7 Therriault, R.G. 2011.

Memo: Notes on the Balfour Downs Property Site Visit, June 28 ‐ July 3, 2011.

8 Therriault, R.G. 2011.

Dahrouge-Australia

Not Available
9 Therriault, R.G. 2010

Memo: Black Fox Property Mapping & Sampling Program, Terrace Bay, Ontario, June 21‐30, 2010.  Internal report prepared for Lund Gold Ltd.

10 Therriault, R.G. 2010.

Report on work completed on the Bearskin Property July to October 2009.  Ontario Assessment Report.

11 Therriault, R.G. 2010.

Report on work completed on the Crooked Green Lake Property, September – October 2009.  Ontario Assessment Report.

12 Therriault, R.G. 2010.

Report on work completed on the Missing Link Property, September 9-13, 2010.  Ontario Assessment Report.

13 Therriault, R.G. 2010.

Report on work completed on claim TB4215323 Missing Link – South Rickaby Property, November 2010.  Unsubmitted Ontario Assessment Report.

14 Therriault, R.G. 2010.

Report on work completed on the Little Bear Lake Property, December 6-21, 2009.  Manitoba Assessment Report

15 Therriault, R.G. 2010.

Report on work completed on the Black Lake Property, December 15, 2008 – January 22, 2009.  Ontario Assessment Report.

16 Therriault, R.G. 2009.

Report on work completed on the Bernadine Lake Property, September 25 to October 20, 2009.  Ontario Assessment Report.

17 Therriault, R.G. 2009.

Report on work completed on the Cote – Two Rivers Property, August 27 to September 17, 2009.  Ontario Assessment Report.

18 Therriault, R.G. 2009.

Report on work completed on the Crooked Green Creek Property October 2, 3 & 7, 2009 & April 9, 12 & 15, 2010.  Ontario Assessment Report.

19 Therriault, R.G. 2009

Report on work completed on the Jacobus East Property, May 2009 – October 2009.  Ontario Assessment Report.

20 Therriault, R.G. 2009.

Report on work completed on the Jacobus East Property, June 2008 – April 2009.  Ontario Assessment Report.

21 Therriault, R.G. 2009.

Report on Assessment Work Completed on the Cote-Two Rivers Property Thunder Bay Mining Division Beardmore Area, Ontario.  Ontario Assessment Report.

22 Therriault, R.G. & L’Heureux, R. 2009.

Technical Report on the Jacobus East Gold Property, Thunder Bay Mining Division, Ontario, Canada, NTS 42E/13.  NI 43-101 Technical Report prepared for Sage Gold Inc.

23 Therriault, R.G. 2009.

Report on work completed on the King Solomon’s Pillars Property, May to October, 2009.  Ontario Assessment Report.

24 Therriault, R.G. 2009.

Report on work completed on the Currie and Tom Johnson Showings, Tashota-Nipigon Mine Area, August, September and October, 2009.  Ontario Assessment Report.

25 Therriault, R.G. 2009.

Report on work completed on the Paint Lake Property, May to October, 2009.  Ontario Assessment Report

26 Therriault, R.G. 2009.

Report on work completed on the Pillars Property, August to October, 2009.  Ontario Assessment Report.

27 Therriault, R.G. 2009

Report on work completed on the Vincent Lake Property, Sept 18; Sept 19; Oct 3; 11; 18; 24-27; 29-31.  Ontario Assessment Report.

28 Therriault, R.G. and Kretschmar, U. 2008.

Technical report on the Onaman Property, Thunder Bay Mining Division, Ontario, Canada. Internal report prepared for Sage Gold Inc.

29 Therriault, R.G. 2008.

Geological report on the Paint Lake Property Gold Showing, Thunder Bay Mining Division, Ontario.  Internal report prepared for Sage Gold Inc.

30 Therriault, R.G. 2008.

Report on the May 2008 RC drilling program, Tunerq Ni-Cu-Co Showing, Pelly Bay region, eastern Nunavut. Internal report prepared for Diamonds North Resources Ltd.

31 Therriault, R.G. 2007.

Los Patos Zone geology and mineralization, Argentina.   Internal report prepared for Wealth Minerals Ltd.

Not Available
32 Therriault, R.G. (contributor). 2007

Technical Report on the precious and base metal potential of the Siwash Creek Property, Similkameen Mining Division, NTS 092H, British Columbia, Canada.  NI 43-101 Technical Report prepared for Ravencrest  Resources Inc.

33 Therriault, R.G. (contributor). 2007.

Technical Report on the precious and base metal potential of the New Moon Property, British Columbia.  Unfiled NI 43-101 Technical Report prepared for Anglo Columbia Mines Inc.

Not Available
34 Therriault, R.G, and L’Heureux, R. 2007.

New Moon field program update.  Internal report prepared for Anglo Columbia Mines Inc.

Not Available
35 Therriault, R.G. 2007.

2007 New Moon Exploration Program.  Internal Field Guide prepared for Anglo Columbia Mines Inc.

Not Available
36 Therriault, R.G. 2007.

Carnierinho Au property geology and mineralization.  Internal report and map prepared for Lund Gold Ltd.

37 Therriault, R.G. 2007.

Physical volcanology, alteration and mineralization at the Greenshields Property, Ecuador.  Internal report and map prepared for Greenshields Resources Ltd.

Not Available
38 Therriault, R.G. 2006.

Report on the Minto exploration drilling program, May/June 2006.  Internal report prepared for Sherwood Copper Corp

39 Therriault, R.G. 2006.

Geology and mineralization of the Blueberry vein system.  Internal report and map prepared for Tenajon Resources Corp.

Not Available
40 Therriault, R.G. 2006.

Geology of the Peanut Showing and surrounding area.  Internal report and map prepared for Committee Bay Resources Ltd.

Not Available
41 Therriault, R.G. 2006.

Report on 2006 sampling and prospecting program, Siwash Creek Property.  Internal report prepared for Ravencrest Resources Inc.

42 Therriault, R.G. 2006.

Alteration, gold mineralization and volcanic stratigraphy in the Hope Bay Volcanic Belt, Nunavut.  M.Sc. Thesis. The University of Western Ontario.

43 Therriault, R.G., and Duke, N.A. 2005

Gold related white mica-ankerite-sulphide alteration of basaltic komatiites in the Hope Bay Deformation Zone, Nunavut. (poster). CIM Toronto Meeting, April.

Not Available
44 Therriault, R.G., Kleepsies, P., and Duke, N.A. 2003

Volcanic stratigraphic control of gold mineralization occurring at the Madrid Bend in the Hope Bay Deformation Zone, Nunavut. (poster). 31st Yellowknife Geoscience Forum, Yellowknife, NWT, November 19-21, Program & Abstracts of Talks & Posters p. 96

45 Therriault, R.G. 2003

A study of the petrology and economic potential of sillimanite-grade banded iron formation hosted gold west of Bathurst Inlet, Nunavut. B.Sc. Thesis. The University of Western Ontario.

46 Therriault, R.G., Duke, N.A. and Wyllie, R.J. 2002

Metallogeny of the BIF-hosted lode gold prospects in the Bathurst Terrane, Northeastern Slave Province, Nunavut. (poster). 30th Yellowknife Geoscience Forum, Yellowknife, NWT, November 19-23, Abstracts of Talks & Posters p. 16.